Grouting Equipment

Mixing Units

Tecniwell dominates the world market in the field of jet grouting equipment for ground stabilization.
Tecniwell offers a wide selection of Mixing Units with volumetric flow rates ranging from 5 to 120 m³/h. Depending on customer requirements, the Mixing Units can be supplied mounted on open skids or containerized and equipped with manual or fully automatic controls. It comes with data logging which helps in keeping records of production.
GM5
GM8
TWM12
TWM20
TWM30
TWM40
TWM50
MTW2500-TWIN
MTW2800-TWIN

Triplex Pumps

Tecniwell high-pressure and medium-pressure Triplex pump with operating pressures up to 900 bar and 2600 lt/min are available in versions from 150 to 1000 hp.
JETTING TRIPLEX PUMPS (DIESEL)
TW100
TW200
TW355
TW400
TW500
TW600
TW800
TW1000
ELECTRIC TRIPLEX PUMPS
TW100/E
TW250/E
TW400/E
TW600/VE
TW1000/E
MUD TRIPLEX PUMPS
TW150
TW250
TW250/E
TW708
TW800/M

Compact Jet-Grouting Unit

These are compact units for Jet-Grouting equipped with high-pressure triplex pumps and automatic mixer, all in one ultra-compact container and can be diesel-electric drive or fully electric. Are the best solution for jobsites where available space is limited or where it is still necessary to reduce the overall dimensions.
TW1012
TW2015
TW3520
TW4020
TW4020/E
TW5020

Injection / Mixing Unit

Combined systems consisting of manual or automatic mixing units and injection pumps, they can be made with a fully electric drive or a diesel engine to make them completely independent. Customized solutions are available on request.

GMP59 / GMP522
GMP89 / GMP822
GMP59V / GMP522V
GMP89V / GMP822V
GMP89VT / GMP822VT
GMP59D / GMP522D
GMP89D / GMP822D
GMP1255
GMP1240D

Grout Pumps

Tecniwell Grout Pumps can easily meet all the main requirements for low and medium pressure applications such as micro piling, anchoring injections, permeation grouting, compensation grouting, grout filling (e.g. cavities in mines, tunnels, etc.), drilling mud injections, etc. In particular, for backfilling operations in tunnel construction works, our more powerful Grout Pumps are frequently used to convey two-component slurries from the mixing plant, usually located outside, to the TBM excavating inside the tunnel.
GP3V
GP5V
GP9H
GP22H
GP22HFV
GP22V
GP37H
GP45H
JP37H
JP45H
JP55V

Drill Strings

In order to provide its customers with an increasingly comprehensive service, Tecniwell has developed a wide range of auxiliary equipment for various jetting systems, including: A new system of drilling/injection rods (“ALL IN ONE”) of simple, modular design that can be used for the three different jet grouting methods (JET1, JET2, JET3) without having to change the whole drill string when switching from one method to another; New swivels, smaller and stronger; New grouting monitors and special or custom-made accessories for the various grouting methods.

Dust Silos

In addition, the compact shape produces a smaller environmental impact compared to traditional vertical silos. Tecniwell horizontal silos are equipped with:
  • Internal screw conveyor
  • Safety pressure-relief valve
  • Vibrating and thinning system
  • Locking system for stacking silos over Tecniwell Mixing Units
  • Safety kit consisting of step irons and safety rails
  • Electronic load cells and weight display (optional)
  • Safety kit (optional)
TWSILO 1.5T
TWSILO 5T
TWSILO 10T
TWSILO 30T0
TWSILO 30T+30T
TWSILO 33T
TWSILO 35T
TW50